RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3401036454 - Archived data from Mon, 17. May 2021 09:17:33 CEST


This is all the information about APD 3401036454. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3401036454
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 156
Position in Box: 29
EP1 batch: 185
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4206709 V     T = -25 °C: 346.8421782 V
Voltage for Gain 150: T = +20 °C: 390.3076525 V     T = -25 °C: 354.2442796 V
Voltage for Gain 200: T = +20 °C: 394.6878183 V     T = -25 °C: 358.432149 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.472282214 V-1     T = -25 °C: 4.934745672 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.712613594 V-1     T = -25 °C: 9.462486834 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.16194141 V-1     T = -25 °C: 14.30714654 V-1
Break-through voltage: T = +20 °C: 409.8911052 V     T = -25 °C: 373.3592765 V
   
Notes:


Version history

Time Author Change comment
07. Feb 2022 10:46:09 CET oafedulidis Assigned to capsule by script
17. May 2021 09:17:33 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:08:23 CET jreher Updated box and position via API.
11. Aug 2020 18:02:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:28 CEST jreher Updated APD location via API.
03. Feb 2020 14:21:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:35 CET jreher Updated APD location via API.
27. Nov 2019 19:56:27 CET jreher Updated APD location via API.
25. Nov 2019 17:23:15 CET jreher Updated box and position via API.
04. Oct 2019 12:05:36 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:58 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:43 CET Tobias Imported from Hamamatsu datasheet.