RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3401036444 - Archived data from Tue, 11. August 2020 18:02:55 CEST


This is all the information about APD 3401036444. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3401036444
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 9.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 156
Position in Box: 20
EP1 batch: 185
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.3932788 V     T = -25 °C: 346.8650093 V
Voltage for Gain 150: T = +20 °C: 390.258249 V     T = -25 °C: 354.3135042 V
Voltage for Gain 200: T = +20 °C: 394.6359321 V     T = -25 °C: 358.5020609 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.496857715 V-1     T = -25 °C: 4.945202498 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.740055442 V-1     T = -25 °C: 9.145837428 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18797556 V-1     T = -25 °C: 16.15715239 V-1
Break-through voltage: T = +20 °C: 410.3569893 V     T = -25 °C: 374.1477482 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:12:35 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:42 CEST jreher Updated box and position via API.
05. Feb 2021 11:08:22 CET jreher Updated box and position via API.
11. Aug 2020 18:02:55 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:27 CEST jreher Updated APD location via API.
03. Feb 2020 14:21:49 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:34 CET jreher Updated APD location via API.
27. Nov 2019 19:56:26 CET jreher Updated APD location via API.
25. Nov 2019 17:23:14 CET jreher Updated box and position via API.
04. Oct 2019 12:05:35 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:57 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:43 CET Tobias Imported from Hamamatsu datasheet.