RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3401036432 - Archived data from Fri, 18. December 2020 14:01:20 CET


This is all the information about APD 3401036432. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3401036432
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 156
Position in Box: 13
EP1 batch: 185
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8007972 V     T = -25 °C: 343.4641625 V
Voltage for Gain 150: T = +20 °C: 386.6220868 V     T = -25 °C: 350.8063288 V
Voltage for Gain 200: T = +20 °C: 390.9733658 V     T = -25 °C: 354.9227885 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.708444737 V-1     T = -25 °C: 4.786441223 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.387964714 V-1     T = -25 °C: 9.741358712 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.64285177 V-1     T = -25 °C: 15.53418116 V-1
Break-through voltage: T = +20 °C: 406.6460002 V     T = -25 °C: 370.2808307 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:45:31 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:08:21 CET jreher Updated box and position via API.
18. Dec 2020 14:01:20 CET jreher Updated box and position via API.
11. Aug 2020 18:02:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:27 CEST jreher Updated APD location via API.
03. Feb 2020 14:21:49 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:34 CET jreher Updated APD location via API.
27. Nov 2019 19:56:25 CET jreher Updated APD location via API.
25. Nov 2019 17:23:13 CET jreher Updated box and position via API.
04. Oct 2019 12:05:35 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:56 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:43 CET Tobias Imported from Hamamatsu datasheet.