RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3401036417 - Archived data from Tue, 11. August 2020 18:02:52 CEST


This is all the information about APD 3401036417. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3401036417
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 156
Position in Box: 1
EP1 batch: 185
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0144389 V     T = -25 °C: 344.7743521 V
Voltage for Gain 150: T = +20 °C: 387.8730135 V     T = -25 °C: 352.1254016 V
Voltage for Gain 200: T = +20 °C: 392.2514151 V     T = -25 °C: 356.2617853 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.627483681 V-1     T = -25 °C: 4.679270516 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.130037232 V-1     T = -25 °C: 9.431965814 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.22217803 V-1     T = -25 °C: 15.01584732 V-1
Break-through voltage: T = +20 °C: 408.0827604 V     T = -25 °C: 371.7181632 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:58 CET jreher Assigned to capsule by script
05. Feb 2021 11:08:20 CET jreher Updated box and position via API.
18. Dec 2020 14:00:06 CET jreher Updated box and position via API.
11. Aug 2020 18:02:52 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:26 CEST jreher Updated APD location via API.
03. Feb 2020 14:21:48 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 12:33:51 CET jreher Updated APD location via API.
28. Nov 2019 10:39:08 CET jreher Updated APD location via API.
27. Nov 2019 19:56:25 CET jreher Updated APD location via API.
25. Nov 2019 17:23:13 CET jreher Updated box and position via API.
04. Oct 2019 12:05:34 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:55 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:42 CET Tobias Imported from Hamamatsu datasheet.