RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3315036393 - Archived data from Tue, 11. August 2020 18:02:51 CEST


This is all the information about APD 3315036393. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3315036393
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.5 V
Dark current: 23.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 155
Position in Box: 45
EP1 batch: 185
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.7606092 V     T = -25 °C: 354.5442664 V
Voltage for Gain 150: T = +20 °C: 397.5367386 V     T = -25 °C: 361.8544167 V
Voltage for Gain 200: T = +20 °C: 401.8400257 V     T = -25 °C: 365.9526248 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.726533699 V-1     T = -25 °C: 4.767084407 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.585534804 V-1     T = -25 °C: 9.727281761 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93119733 V-1     T = -25 °C: 15.40565303 V-1
Break-through voltage: T = +20 °C: 416.1418501 V     T = -25 °C: 380.1857851 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:17 CET jreher Updated box and position via API.
11. Aug 2020 18:02:51 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:25 CEST jreher Updated APD location via API.
03. Feb 2020 14:21:48 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:32 CET jreher Updated APD location via API.
27. Nov 2019 19:56:17 CET jreher Updated APD location via API.
25. Nov 2019 17:23:11 CET jreher Updated box and position via API.
04. Oct 2019 12:05:34 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:28 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:35 CEST Tobias Imported from Hamamatsu datasheet.