RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3315036356 - Archived data from Tue, 11. August 2020 18:02:44 CEST


This is all the information about APD 3315036356. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3315036356
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390.6 V
Dark current: 29.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 155
Position in Box: 12
EP1 batch: 183
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.5352647 V     T = -25 °C: 355.0219945 V
Voltage for Gain 150: T = +20 °C: 398.3328301 V     T = -25 °C: 362.3857954 V
Voltage for Gain 200: T = +20 °C: 402.6576038 V     T = -25 °C: 366.514105 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.442380497 V-1     T = -25 °C: 4.92170899 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.704473942 V-1     T = -25 °C: 9.099776381 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.22581268 V-1     T = -25 °C: 16.2229252 V-1
Break-through voltage: T = +20 °C: 418.0127132 V     T = -25 °C: 381.7176574 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:13 CET jreher Updated box and position via API.
11. Aug 2020 18:02:44 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:22 CEST jreher Updated APD location via API.
03. Feb 2020 14:22:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:30 CET jreher Updated APD location via API.
27. Nov 2019 19:56:14 CET jreher Updated APD location via API.
25. Nov 2019 17:23:09 CET jreher Updated box and position via API.
01. Oct 2019 11:32:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:26 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:34 CEST Tobias Imported from Hamamatsu datasheet.