RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3315036353 - Archived data from Tue, 11. August 2020 18:02:44 CEST


This is all the information about APD 3315036353. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3315036353
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 31.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 155
Position in Box: 10
EP1 batch: 183
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.4455531 V     T = -25 °C: 350.6110767 V
Voltage for Gain 150: T = +20 °C: 393.230614 V     T = -25 °C: 357.9650815 V
Voltage for Gain 200: T = +20 °C: 397.5718624 V     T = -25 °C: 362.1285274 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.493967453 V-1     T = -25 °C: 4.755148234 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.868215275 V-1     T = -25 °C: 9.464984762 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40450832 V-1     T = -25 °C: 15.0358037 V-1
Break-through voltage: T = +20 °C: 412.9839444 V     T = -25 °C: 376.6067724 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:13 CET jreher Updated box and position via API.
11. Aug 2020 18:02:44 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:22 CEST jreher Updated APD location via API.
03. Feb 2020 14:22:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:30 CET jreher Updated APD location via API.
27. Nov 2019 19:56:14 CET jreher Updated APD location via API.
25. Nov 2019 17:23:09 CET jreher Updated box and position via API.
01. Oct 2019 11:32:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:26 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:34 CEST Tobias Imported from Hamamatsu datasheet.