RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3314036313 - Archived data from Tue, 11. August 2020 17:52:20 CEST


This is all the information about APD 3314036313. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3314036313
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 33 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 154
Position in Box: 34
EP1 batch: 183
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:08 CET jreher Updated box and position via API.
11. Aug 2020 18:02:39 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:20 CEST jreher Updated APD location via API.
03. Feb 2020 14:22:29 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:28 CET jreher Updated APD location via API.
27. Nov 2019 19:56:05 CET jreher Updated APD location via API.
25. Nov 2019 17:23:06 CET jreher Updated box and position via API.
01. Oct 2019 11:32:44 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:25 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:34 CEST Tobias Imported from Hamamatsu datasheet.