RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3314036281 - Archived data from Tue, 11. August 2020 18:02:33 CEST


This is all the information about APD 3314036281. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3314036281
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 27.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 154
Position in Box: 5
EP1 batch: 182
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.3606339 V     T = -25 °C: 348.4539657 V
Voltage for Gain 150: T = +20 °C: 391.1119254 V     T = -25 °C: 355.6954602 V
Voltage for Gain 200: T = +20 °C: 395.4333105 V     T = -25 °C: 359.758172 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.549809212 V-1     T = -25 °C: 4.824378246 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.952298671 V-1     T = -25 °C: 9.976107405 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.78897252 V-1     T = -25 °C: 16.01677019 V-1
Break-through voltage: T = +20 °C: 410.1100431 V     T = -25 °C: 374.1712431 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:05 CET jreher Updated box and position via API.
11. Aug 2020 18:02:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:17 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:02 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:25 CET jreher Updated APD location via API.
27. Nov 2019 19:56:03 CET jreher Updated APD location via API.
25. Nov 2019 17:23:02 CET jreher Updated box and position via API.
01. Oct 2019 11:32:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:24 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:33 CEST Tobias Imported from Hamamatsu datasheet.