RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3314036276 - Archived data from Tue, 11. August 2020 18:02:32 CEST


This is all the information about APD 3314036276. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3314036276
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 34.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 154
Position in Box: 1
EP1 batch: 181
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.0516368 V     T = -25 °C: 349.9921149 V
Voltage for Gain 150: T = +20 °C: 392.8239532 V     T = -25 °C: 357.2697185 V
Voltage for Gain 200: T = +20 °C: 397.1419338 V     T = -25 °C: 361.3718359 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.664574299 V-1     T = -25 °C: 4.995808669 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.238480653 V-1     T = -25 °C: 9.345337283 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48763779 V-1     T = -25 °C: 14.76915756 V-1
Break-through voltage: T = +20 °C: 412.3847804 V     T = -25 °C: 376.3162385 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:04 CET jreher Updated box and position via API.
11. Aug 2020 18:02:32 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:16 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:02 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:25 CET jreher Updated APD location via API.
27. Nov 2019 19:56:02 CET jreher Updated APD location via API.
25. Nov 2019 17:23:01 CET jreher Updated box and position via API.
01. Oct 2019 11:31:49 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:24 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:33 CEST Tobias Imported from Hamamatsu datasheet.