RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3314036268 - Archived data from Tue, 11. August 2020 18:02:31 CEST


This is all the information about APD 3314036268. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3314036268
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.2 V
Dark current: 17.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 153
Position in Box: 44
EP1 batch: 181
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.0670041 V     T = -25 °C: 353.0073181 V
Voltage for Gain 150: T = +20 °C: 395.8832023 V     T = -25 °C: 360.3432318 V
Voltage for Gain 200: T = +20 °C: 400.2410891 V     T = -25 °C: 364.4652594 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.574532081 V-1     T = -25 °C: 4.932915246 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.043510252 V-1     T = -25 °C: 9.176007665 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01281766 V-1     T = -25 °C: 16.24300685 V-1
Break-through voltage: T = +20 °C: 415.8993119 V     T = -25 °C: 379.8080134 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:01 CET jreher Updated box and position via API.
11. Aug 2020 18:02:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:16 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:26 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:25 CET jreher Updated APD location via API.
27. Nov 2019 19:55:55 CET jreher Updated APD location via API.
25. Nov 2019 17:23:00 CET jreher Updated box and position via API.
01. Oct 2019 11:31:48 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:36 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:24 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:33 CEST Tobias Imported from Hamamatsu datasheet.