RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3313036227 - Archived data from Tue, 11. August 2020 18:02:26 CEST


This is all the information about APD 3313036227. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3313036227
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 387.3 V
Dark current: 23 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 153
Position in Box: 19
EP1 batch: 180
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9726743 V     T = -25 °C: 351.8666713 V
Voltage for Gain 150: T = +20 °C: 394.7310068 V     T = -25 °C: 359.1619278 V
Voltage for Gain 200: T = +20 °C: 399.0288775 V     T = -25 °C: 363.2519526 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.659690601 V-1     T = -25 °C: 5.050495682 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.352960355 V-1     T = -25 °C: 9.437448652 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.69921032 V-1     T = -25 °C: 15.01571914 V-1
Break-through voltage: T = +20 °C: 413.4146812 V     T = -25 °C: 377.4859068 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:59 CET jreher Updated box and position via API.
11. Aug 2020 18:02:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:14 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:24 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:23 CET jreher Updated APD location via API.
27. Nov 2019 19:55:53 CET jreher Updated APD location via API.
25. Nov 2019 17:22:58 CET jreher Updated box and position via API.
01. Oct 2019 11:31:25 CEST spankonin Updated APD batch assignment via API.
01. Oct 2019 11:30:26 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:23 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:32 CEST Tobias Imported from Hamamatsu datasheet.