RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3313036224 - Archived data from Tue, 11. August 2020 18:02:26 CEST


This is all the information about APD 3313036224. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3313036224
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 28.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 153
Position in Box: 16
EP1 batch: 180
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9660885 V     T = -25 °C: 344.7128539 V
Voltage for Gain 150: T = +20 °C: 386.6630145 V     T = -25 °C: 351.8335931 V
Voltage for Gain 200: T = +20 °C: 390.9570683 V     T = -25 °C: 355.8266572 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.741433262 V-1     T = -25 °C: 4.846337435 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.489295336 V-1     T = -25 °C: 10.02992249 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.84577851 V-1     T = -25 °C: 16.21934443 V-1
Break-through voltage: T = +20 °C: 405.7054484 V     T = -25 °C: 369.9722538 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:58 CET jreher Updated box and position via API.
11. Aug 2020 18:02:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:13 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:24 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:23 CET jreher Updated APD location via API.
27. Nov 2019 19:55:53 CET jreher Updated APD location via API.
25. Nov 2019 17:22:58 CET jreher Updated box and position via API.
01. Oct 2019 11:31:25 CEST spankonin Updated APD batch assignment via API.
01. Oct 2019 11:30:26 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:23 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:32 CEST Tobias Imported from Hamamatsu datasheet.