RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3313036190 - Archived data from Tue, 11. August 2020 18:02:20 CEST


This is all the information about APD 3313036190. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3313036190
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 22.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 152
Position in Box: 37
EP1 batch: 179
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.4970651 V     T = -25 °C: 350.6391284 V
Voltage for Gain 150: T = +20 °C: 393.3239152 V     T = -25 °C: 357.9055541 V
Voltage for Gain 200: T = +20 °C: 397.6764662 V     T = -25 °C: 361.9675022 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.450736273 V-1     T = -25 °C: 5.011086595 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.709045846 V-1     T = -25 °C: 10.03166031 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18055476 V-1     T = -25 °C: 15.51560037 V-1
Break-through voltage: T = +20 °C: 413.0844216 V     T = -25 °C: 376.79048 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:53 CET jreher Updated box and position via API.
11. Aug 2020 18:02:20 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:11 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:43 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:20 CET jreher Updated APD location via API.
27. Nov 2019 19:55:43 CET jreher Updated APD location via API.
25. Nov 2019 17:22:55 CET jreher Updated box and position via API.
01. Oct 2019 11:29:22 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:22 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:32 CEST Tobias Imported from Hamamatsu datasheet.