RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3312036159 - Archived data from Tue, 11. August 2020 18:02:17 CEST


This is all the information about APD 3312036159. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3312036159
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 385.7 V
Dark current: 22.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 152
Position in Box: 22
EP1 batch: 179
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7276123 V     T = -25 °C: 350.665472 V
Voltage for Gain 150: T = +20 °C: 393.481336 V     T = -25 °C: 357.9041455 V
Voltage for Gain 200: T = +20 °C: 397.7667492 V     T = -25 °C: 361.9593194 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.738469188 V-1     T = -25 °C: 4.753798821 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.662419112 V-1     T = -25 °C: 9.750579537 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.1599479 V-1     T = -25 °C: 15.6205516 V-1
Break-through voltage: T = +20 °C: 410.2807231 V     T = -25 °C: 374.6233575 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:51 CET jreher Updated box and position via API.
11. Aug 2020 18:02:17 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:09 CEST jreher Updated APD location via API.
03. Feb 2020 14:24:05 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:19 CET jreher Updated APD location via API.
27. Nov 2019 19:55:42 CET jreher Updated APD location via API.
25. Nov 2019 17:22:54 CET jreher Updated box and position via API.
01. Oct 2019 11:29:21 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:25 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:21 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:31 CEST Tobias Imported from Hamamatsu datasheet.