RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3311036076 - Archived data from Tue, 11. August 2020 18:02:06 CEST


This is all the information about APD 3311036076. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3311036076
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 386 V
Dark current: 21.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 151
Position in Box: 16
EP1 batch: 177
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1752878 V     T = -25 °C: 351.9713767 V
Voltage for Gain 150: T = +20 °C: 394.8834966 V     T = -25 °C: 359.2327034 V
Voltage for Gain 200: T = +20 °C: 399.164132 V     T = -25 °C: 363.3097647 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.598675732 V-1     T = -25 °C: 5.05073961 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.251132012 V-1     T = -25 °C: 9.404146805 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53999883 V-1     T = -25 °C: 15.01477391 V-1
Break-through voltage: T = +20 °C: 412.4833521 V     T = -25 °C: 376.6089428 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:43 CET jreher Updated box and position via API.
11. Aug 2020 18:02:06 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:04 CEST jreher Updated APD location via API.
03. Feb 2020 14:24:44 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:15 CET jreher Updated APD location via API.
27. Nov 2019 19:55:30 CET jreher Updated APD location via API.
25. Nov 2019 17:22:48 CET jreher Updated box and position via API.
26. Sep 2019 15:32:53 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:17 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:20 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:30 CEST Tobias Imported from Hamamatsu datasheet.