RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3311036063 - Archived data from Tue, 11. August 2020 18:02:04 CEST


This is all the information about APD 3311036063. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3311036063
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 20.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 151
Position in Box: 5
EP1 batch: 177
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.4673498 V     T = -25 °C: 352.2983079 V
Voltage for Gain 150: T = +20 °C: 395.2836608 V     T = -25 °C: 359.6470558 V
Voltage for Gain 200: T = +20 °C: 399.6398867 V     T = -25 °C: 363.7658173 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.452704473 V-1     T = -25 °C: 4.875922972 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.785659063 V-1     T = -25 °C: 9.959725992 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.36372677 V-1     T = -25 °C: 15.87603015 V-1
Break-through voltage: T = +20 °C: 414.1986458 V     T = -25 °C: 378.417048 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:42 CET jreher Updated box and position via API.
11. Aug 2020 18:02:04 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:03 CEST jreher Updated APD location via API.
03. Feb 2020 14:24:43 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:14 CET jreher Updated APD location via API.
27. Nov 2019 19:55:30 CET jreher Updated APD location via API.
25. Nov 2019 17:22:48 CET jreher Updated box and position via API.
26. Sep 2019 15:32:53 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:16 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:19 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:30 CEST Tobias Imported from Hamamatsu datasheet.