RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3311036050 - Archived data from Tue, 11. August 2020 18:02:02 CEST


This is all the information about APD 3311036050. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3311036050
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376.2 V
Dark current: 13.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 150
Position in Box: 45
EP1 batch: 176
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.5901456 V     T = -25 °C: 342.6361518 V
Voltage for Gain 150: T = +20 °C: 384.1980485 V     T = -25 °C: 349.6609097 V
Voltage for Gain 200: T = +20 °C: 388.470974 V     T = -25 °C: 353.5950732 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.603487989 V-1     T = -25 °C: 4.949105643 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.074448003 V-1     T = -25 °C: 10.39689497 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1903281 V-1     T = -25 °C: 17.10944883 V-1
Break-through voltage: T = +20 °C: 403.7948142 V     T = -25 °C: 368.0964955 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:38 CET jreher Updated box and position via API.
11. Aug 2020 18:02:02 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:02 CEST jreher Updated APD location via API.
03. Feb 2020 14:24:43 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:13 CET jreher Updated APD location via API.
27. Nov 2019 19:55:22 CET jreher Updated APD location via API.
25. Nov 2019 17:22:46 CET jreher Updated box and position via API.
26. Sep 2019 15:33:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:19 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:30 CEST Tobias Imported from Hamamatsu datasheet.