RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3311036035 - Archived data from Fri, 05. July 2019 13:56:10 CEST


This is all the information about APD 3311036035. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3311036035
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 150
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 23 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 150
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:40:51 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:22 CET jreher Updated box and position via API.
05. Feb 2021 11:07:37 CET jreher Updated box and position via API.
11. Aug 2020 18:01:59 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:01 CEST jreher Updated APD location via API.
03. Feb 2020 14:25:03 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:12 CET jreher Updated APD location via API.
27. Nov 2019 19:55:21 CET jreher Updated APD location via API.
25. Nov 2019 17:22:45 CET jreher Updated box and position via API.
26. Sep 2019 15:33:17 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:10 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:18 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:29 CEST Tobias Imported from Hamamatsu datasheet.