Serial: 3311036025
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 22.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 150
Position in Box: 23
EP1 batch: 176
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7622825 V     T = -25 °C: 346.9671846 V
Voltage for Gain 150: T = +20 °C: 389.5424539 V     T = -25 °C: 354.2264703 V
Voltage for Gain 200: T = +20 °C: 393.8848349 V     T = -25 °C: 358.3182985 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.735922144 V-1     T = -25 °C: 5.059755289 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.44177867 V-1     T = -25 °C: 9.367073097 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.7462801 V-1     T = -25 °C: 14.81239359 V-1
Break-through voltage: T = +20 °C: 409.7407437 V     T = -25 °C: 373.7095428 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:36 CET jreher Updated box and position via API.
11. Aug 2020 18:01:58 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:00 CEST jreher Updated APD location via API.
03. Feb 2020 14:25:03 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:11 CET jreher Updated APD location via API.
27. Nov 2019 19:55:20 CET jreher Updated APD location via API.
25. Nov 2019 17:22:44 CET jreher Updated box and position via API.
26. Sep 2019 15:33:16 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:10 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:18 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:29 CEST Tobias Imported from Hamamatsu datasheet.