RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3310035995 - Archived data from Fri, 05. February 2021 11:07:35 CET


This is all the information about APD 3310035995. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3310035995
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 20.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 150
Position in Box: 12
EP1 batch: 175
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.4746432 V     T = -25 °C: 349.3547475 V
Voltage for Gain 150: T = +20 °C: 392.2404728 V     T = -25 °C: 356.6433576 V
Voltage for Gain 200: T = +20 °C: 396.5619892 V     T = -25 °C: 360.7254291 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.487380317 V-1     T = -25 °C: 4.826428704 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.832422738 V-1     T = -25 °C: 10.00428643 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.60974797 V-1     T = -25 °C: 16.09661637 V-1
Break-through voltage: T = +20 °C: 411.3860853 V     T = -25 °C: 375.2328502 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:22:39 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:00 CEST jreher Updated box and position via API.
05. Feb 2021 11:07:35 CET jreher Updated box and position via API.
11. Aug 2020 18:01:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:59 CEST jreher Updated APD location via API.
03. Feb 2020 14:25:02 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:10 CET jreher Updated APD location via API.
27. Nov 2019 19:55:19 CET jreher Updated APD location via API.
25. Nov 2019 17:22:43 CET jreher Updated box and position via API.
26. Sep 2019 15:34:03 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:09 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:18 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:29 CEST Tobias Imported from Hamamatsu datasheet.