RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3310035959 - Archived data from Tue, 11. August 2020 18:01:49 CEST


This is all the information about APD 3310035959. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3310035959
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.1 V
Dark current: 27.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 149
Position in Box: 16
EP1 batch: 174
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.7743013 V     T = -25 °C: 353.1589788 V
Voltage for Gain 150: T = +20 °C: 394.8597102 V     T = -25 °C: 360.3818876 V
Voltage for Gain 200: T = +20 °C: 399.3774297 V     T = -25 °C: 364.4613411 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.564306007 V-1     T = -25 °C: 4.98590657 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.862458103 V-1     T = -25 °C: 9.348565749 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.47906722 V-1     T = -25 °C: 14.73219967 V-1
Break-through voltage: T = +20 °C: 414.2328227 V     T = -25 °C: 378.1948705 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:29 CET jreher Updated box and position via API.
11. Aug 2020 18:01:49 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:56 CEST jreher Updated APD location via API.
30. Jan 2020 14:06:16 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:07 CET jreher Updated APD location via API.
27. Nov 2019 19:55:09 CET jreher Updated APD location via API.
25. Nov 2019 17:22:40 CET jreher Updated box and position via API.
26. Sep 2019 15:34:30 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:16 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:28 CEST Tobias Imported from Hamamatsu datasheet.