RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3309035914 - Archived data from Tue, 11. August 2020 18:01:45 CEST


This is all the information about APD 3309035914. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3309035914
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.7 V
Dark current: 37.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 148
Position in Box: 43
EP1 batch: 174
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1743366 V     T = -25 °C: 350.5046265 V
Voltage for Gain 150: T = +20 °C: 392.8937174 V     T = -25 °C: 357.7347871 V
Voltage for Gain 200: T = +20 °C: 397.2065341 V     T = -25 °C: 361.7883967 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.625500762 V-1     T = -25 °C: 4.84107231 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.18607175 V-1     T = -25 °C: 10.00203583 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36629639 V-1     T = -25 °C: 16.04035727 V-1
Break-through voltage: T = +20 °C: 412.2251876 V     T = -25 °C: 376.0387953 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:24 CET jreher Updated box and position via API.
11. Aug 2020 18:01:45 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:54 CEST jreher Updated APD location via API.
30. Jan 2020 14:06:14 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:06 CET jreher Updated APD location via API.
27. Nov 2019 19:55:00 CET jreher Updated APD location via API.
25. Nov 2019 17:22:37 CET jreher Updated box and position via API.
26. Sep 2019 15:34:29 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:57 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:15 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:28 CEST Tobias Imported from Hamamatsu datasheet.