RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3309035899 - Archived data from Tue, 11. August 2020 18:01:43 CEST


This is all the information about APD 3309035899. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3309035899
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 31.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 148
Position in Box: 36
EP1 batch: 173
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7188956 V     T = -25 °C: 351.2556825 V
Voltage for Gain 150: T = +20 °C: 393.4783046 V     T = -25 °C: 358.5127387 V
Voltage for Gain 200: T = +20 °C: 397.7931547 V     T = -25 °C: 362.5698637 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.755044228 V-1     T = -25 °C: 4.887763325 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.427604634 V-1     T = -25 °C: 10.03822223 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.72421539 V-1     T = -25 °C: 16.07085281 V-1
Break-through voltage: T = +20 °C: 412.0632137 V     T = -25 °C: 376.4898894 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:23 CET jreher Updated box and position via API.
11. Aug 2020 18:01:43 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:53 CEST jreher Updated APD location via API.
30. Jan 2020 14:05:06 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:05 CET jreher Updated APD location via API.
27. Nov 2019 19:55:00 CET jreher Updated APD location via API.
25. Nov 2019 17:22:37 CET jreher Updated box and position via API.
26. Sep 2019 15:34:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:15 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:27 CEST Tobias Imported from Hamamatsu datasheet.