RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3308035882 - Archived data from Tue, 11. August 2020 18:01:41 CEST


This is all the information about APD 3308035882. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3308035882
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 39.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 148
Position in Box: 25
EP1 batch: 173
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2413408 V     T = -25 °C: 346.7259496 V
Voltage for Gain 150: T = +20 °C: 388.9409025 V     T = -25 °C: 353.9089664 V
Voltage for Gain 200: T = +20 °C: 393.2446262 V     T = -25 °C: 357.9421333 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.629294025 V-1     T = -25 °C: 5.170079914 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.164832627 V-1     T = -25 °C: 9.813002426 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27081486 V-1     T = -25 °C: 15.73135856 V-1
Break-through voltage: T = +20 °C: 407.4428722 V     T = -25 °C: 371.7054027 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:22 CET jreher Updated box and position via API.
11. Aug 2020 18:01:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:52 CEST jreher Updated APD location via API.
30. Jan 2020 14:05:05 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:04 CET jreher Updated APD location via API.
27. Nov 2019 19:54:59 CET jreher Updated APD location via API.
25. Nov 2019 17:22:36 CET jreher Updated box and position via API.
26. Sep 2019 15:34:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:15 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:27 CEST Tobias Imported from Hamamatsu datasheet.