Show Hamamatsu Avalanche Photo Diode 3308035858 - Archived data from Tue, 11. August 2020 18:01:37 CEST


This is all the information about APD 3308035858. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3308035858
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.2 V
Dark current: 31.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 148
Position in Box: 7
EP1 batch: 172
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.7772896 V     T = -25 °C: 352.708198 V
Voltage for Gain 150: T = +20 °C: 395.5411533 V     T = -25 °C: 359.9755664 V
Voltage for Gain 200: T = +20 °C: 399.8333364 V     T = -25 °C: 364.0418287 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.746895846 V-1     T = -25 °C: 4.758640092 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.627751368 V-1     T = -25 °C: 9.689189904 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.16274183 V-1     T = -25 °C: 15.52575301 V-1
Break-through voltage: T = +20 °C: 413.5719259 V     T = -25 °C: 377.6061629 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:20 CET jreher Updated box and position via API.
11. Aug 2020 18:01:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:51 CEST jreher Updated APD location via API.
30. Jan 2020 14:05:03 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:03 CET jreher Updated APD location via API.
27. Nov 2019 19:54:57 CET jreher Updated APD location via API.
25. Nov 2019 17:22:34 CET jreher Updated box and position via API.
26. Sep 2019 15:35:17 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:14 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:27 CEST Tobias Imported from Hamamatsu datasheet.