RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3308035850 - Archived data from Tue, 11. August 2020 18:01:36 CEST


This is all the information about APD 3308035850. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3308035850
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 388.3 V
Dark current: 38.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 147
Position in Box: 50
EP1 batch: 172
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1995009 V     T = -25 °C: 352.4279733 V
Voltage for Gain 150: T = +20 °C: 395.0273166 V     T = -25 °C: 359.7409879 V
Voltage for Gain 200: T = +20 °C: 399.3880038 V     T = -25 °C: 363.7886419 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.543340362 V-1     T = -25 °C: 4.638731851 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.891065871 V-1     T = -25 °C: 9.483582893 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.65821226 V-1     T = -25 °C: 17.69516688 V-1
Break-through voltage: T = +20 °C: 413.1172172 V     T = -25 °C: 377.323991 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:17 CET jreher Updated box and position via API.
11. Aug 2020 18:01:36 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:50 CEST jreher Updated APD location via API.
30. Jan 2020 14:04:45 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:02 CET jreher Updated APD location via API.
27. Nov 2019 19:54:50 CET jreher Updated APD location via API.
25. Nov 2019 17:22:33 CET jreher Updated box and position via API.
26. Sep 2019 15:35:16 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:14 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:27 CEST Tobias Imported from Hamamatsu datasheet.