RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3307035830 - Archived data from Tue, 11. August 2020 18:01:35 CEST


This is all the information about APD 3307035830. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3307035830
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 391.1 V
Dark current: 37.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 147
Position in Box: 42
EP1 batch: 172
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.1404207 V     T = -25 °C: 355.7652888 V
Voltage for Gain 150: T = +20 °C: 398.9363128 V     T = -25 °C: 363.1257586 V
Voltage for Gain 200: T = +20 °C: 403.2659185 V     T = -25 °C: 367.1431133 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.570991296 V-1     T = -25 °C: 4.970188472 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.0567298 V-1     T = -25 °C: 8.828535837 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.14916305 V-1     T = -25 °C: 15.26316353 V-1
Break-through voltage: T = +20 °C: 417.9185685 V     T = -25 °C: 381.8606185 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:16 CET jreher Updated box and position via API.
11. Aug 2020 18:01:35 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:49 CEST jreher Updated APD location via API.
30. Jan 2020 14:04:45 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:02 CET jreher Updated APD location via API.
27. Nov 2019 19:54:49 CET jreher Updated APD location via API.
25. Nov 2019 17:22:32 CET jreher Updated box and position via API.
26. Sep 2019 15:35:16 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:14 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:27 CEST Tobias Imported from Hamamatsu datasheet.