RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0807007720 - Archived data from Tue, 11. August 2020 17:56:47 CEST


This is all the information about APD 0807007720. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0807007720
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 298
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 91
Position in grid: 11
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 16. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 389 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.6311725 V     T = -25 °C: 353.695342 V
Voltage for Gain 150: T = +20 °C: 397.6267133 V     T = -25 °C: 361.3456716 V
Voltage for Gain 200: T = +20 °C: 402.0704738 V     T = -25 °C: 365.6951089 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.339834698 V-1     T = -25 °C: 4.551130221 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.207343553 V-1     T = -25 °C: 8.722597132 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.23550223 V-1     T = -25 °C: 14.86856374 V-1
Break-through voltage: T = +20 °C: 416.7121018 V     T = -25 °C: 380.6821132 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:42 CET jreher Updated box and position via API.
11. Aug 2020 17:56:47 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:25 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:15 CEST jreher Updated box and position via API.
19. Dec 2019 15:49:36 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:35 CET jreher Updated box and position via API.
23. Aug 2017 16:05:03 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:09:14 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:57:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:21 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:36 CEST Tobias Imported from Hamamatsu datasheet.