RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0807007717 - Archived data from Fri, 18. December 2020 14:00:05 CET


This is all the information about APD 0807007717. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0807007717
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.1 V
Dark current: 2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 298
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 91
Position in grid: 7
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 16. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 380.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3760289 V     T = -25 °C: 344.7832073 V
Voltage for Gain 150: T = +20 °C: 388.1979183 V     T = -25 °C: 352.1549143 V
Voltage for Gain 200: T = +20 °C: 392.5445707 V     T = -25 °C: 356.2913774 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.47561297 V-1     T = -25 °C: 4.965276445 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.824405128 V-1     T = -25 °C: 9.336006555 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.46701517 V-1     T = -25 °C: 14.64871134 V-1
Break-through voltage: T = +20 °C: 403.1284368 V     T = -25 °C: 372.1044404 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:54 CET jreher Assigned to capsule by script
05. Feb 2021 11:26:42 CET jreher Updated box and position via API.
18. Dec 2020 14:00:05 CET jreher Updated box and position via API.
11. Aug 2020 17:56:47 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:25 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:15 CEST jreher Updated box and position via API.
19. Dec 2019 15:49:35 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:35 CET jreher Updated box and position via API.
23. Aug 2017 16:05:03 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:09:14 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:57:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:21 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:36 CEST Tobias Imported from Hamamatsu datasheet.