RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0807007715 - Archived data from Mon, 03. May 2021 15:18:37 CEST


This is all the information about APD 0807007715. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0807007715
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 2.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 298
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 91
Position in grid: 5
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 16. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 380.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.918026 V     T = -25 °C: 346.0780912 V
Voltage for Gain 150: T = +20 °C: 388.7976354 V     T = -25 °C: 353.4854108 V
Voltage for Gain 200: T = +20 °C: 393.1697848 V     T = -25 °C: 357.0529038 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.586373193 V-1     T = -25 °C: 4.897091118 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.120361037 V-1     T = -25 °C: 9.04965269 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.2666383 V-1     T = -25 °C: 15.84621644 V-1
Break-through voltage: T = +20 °C: 408.2920715 V     T = -25 °C: 371.8459204 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:16:27 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:18:37 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:42 CET jreher Updated box and position via API.
11. Aug 2020 17:56:47 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:24 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:15 CEST jreher Updated box and position via API.
19. Dec 2019 15:49:35 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:34 CET jreher Updated box and position via API.
23. Aug 2017 16:05:03 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:09:14 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:57:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:21 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:36 CEST Tobias Imported from Hamamatsu datasheet.