RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3305035765 - Archived data from Tue, 11. August 2020 18:01:27 CEST


This is all the information about APD 3305035765. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3305035765
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 36.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 147
Position in Box: 4
EP1 batch: 171
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1355482 V     T = -25 °C: 348.5772371 V
Voltage for Gain 150: T = +20 °C: 390.8625715 V     T = -25 °C: 355.7769668 V
Voltage for Gain 200: T = +20 °C: 395.197012 V     T = -25 °C: 359.8253001 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.644898831 V-1     T = -25 °C: 4.831990129 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.815167422 V-1     T = -25 °C: 9.872560332 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.12622798 V-1     T = -25 °C: 15.90560951 V-1
Break-through voltage: T = +20 °C: 408.0121208 V     T = -25 °C: 372.8025742 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:12 CET jreher Updated box and position via API.
11. Aug 2020 18:01:27 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:46 CEST jreher Updated APD location via API.
30. Jan 2020 14:04:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:59 CET jreher Updated APD location via API.
27. Nov 2019 19:54:46 CET jreher Updated APD location via API.
25. Nov 2019 17:22:29 CET jreher Updated box and position via API.
26. Sep 2019 15:35:37 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:12 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:26 CEST Tobias Imported from Hamamatsu datasheet.