RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3305035757 - Archived data from Tue, 11. August 2020 18:01:26 CEST


This is all the information about APD 3305035757. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3305035757
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A10
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 388.9 V
Dark current: 29.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 146
Position in Box: 48
EP1 batch: 170
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.9099596 V     T = -25 °C: 353.6782244 V
Voltage for Gain 150: T = +20 °C: 395.7391784 V     T = -25 °C: 360.8156959 V
Voltage for Gain 200: T = +20 °C: 400.0808301 V     T = -25 °C: 364.8969911 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.711062228 V-1     T = -25 °C: 4.625507315 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.542893207 V-1     T = -25 °C: 9.585899648 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.6717792 V-1     T = -25 °C: 15.11321075 V-1
Break-through voltage: T = +20 °C: 415.1278224 V     T = -25 °C: 378.9134135 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:09 CET jreher Updated box and position via API.
11. Aug 2020 18:01:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:45 CEST jreher Updated APD location via API.
30. Jan 2020 14:04:11 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:58 CET jreher Updated APD location via API.
27. Nov 2019 19:54:38 CET jreher Updated APD location via API.
25. Nov 2019 17:22:28 CET jreher Updated box and position via API.
23. Sep 2019 17:21:02 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:12 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:26 CEST Tobias Imported from Hamamatsu datasheet.