RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3304035725 - Archived data from Tue, 11. August 2020 18:01:24 CEST


This is all the information about APD 3304035725. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3304035725
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 35.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 146
Position in Box: 39
EP1 batch: 170
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7549581 V     T = -25 °C: 346.4791971 V
Voltage for Gain 150: T = +20 °C: 388.4855739 V     T = -25 °C: 353.6928837 V
Voltage for Gain 200: T = +20 °C: 392.805313 V     T = -25 °C: 357.7542726 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.795151491 V-1     T = -25 °C: 5.04696963 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.685987993 V-1     T = -25 °C: 9.886707895 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.09828201 V-1     T = -25 °C: 16.0839827 V-1
Break-through voltage: T = +20 °C: 407.632792 V     T = -25 °C: 372.0853248 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:08 CET jreher Updated box and position via API.
11. Aug 2020 18:01:24 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:45 CEST jreher Updated APD location via API.
28. Jan 2020 16:59:07 CET vwerner Updated APD batch assignment via API.
28. Jan 2020 16:50:40 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:48:58 CET jreher Updated APD location via API.
27. Nov 2019 19:54:38 CET jreher Updated APD location via API.
25. Nov 2019 17:22:27 CET jreher Updated box and position via API.
23. Sep 2019 17:21:01 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:12 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:25 CEST Tobias Imported from Hamamatsu datasheet.