RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3304035697 - Archived data from Tue, 11. August 2020 18:01:20 CEST


This is all the information about APD 3304035697. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3304035697
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 31 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 146
Position in Box: 19
EP1 batch: 170
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.4560386 V     T = -25 °C: 344.1547055 V
Voltage for Gain 150: T = +20 °C: 386.0834881 V     T = -25 °C: 351.2646055 V
Voltage for Gain 200: T = +20 °C: 390.3722571 V     T = -25 °C: 355.3042612 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.588188048 V-1     T = -25 °C: 5.291736242 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.118513035 V-1     T = -25 °C: 10.00715109 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16903172 V-1     T = -25 °C: 15.32813685 V-1
Break-through voltage: T = +20 °C: 405.8226599 V     T = -25 °C: 370.1042553 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:06 CET jreher Updated box and position via API.
11. Aug 2020 18:01:20 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:43 CEST jreher Updated APD location via API.
28. Jan 2020 16:59:05 CET vwerner Updated APD batch assignment via API.
28. Jan 2020 16:50:38 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:48:56 CET jreher Updated APD location via API.
27. Nov 2019 19:54:36 CET jreher Updated APD location via API.
25. Nov 2019 17:22:25 CET jreher Updated box and position via API.
23. Sep 2019 17:21:00 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:11 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:25 CEST Tobias Imported from Hamamatsu datasheet.