RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3304035690 - Archived data from Fri, 05. February 2021 11:07:05 CET


This is all the information about APD 3304035690. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3304035690
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 27.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 146
Position in Box: 13
EP1 batch: 169
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.1422819 V     T = -25 °C: 349.6204451 V
Voltage for Gain 150: T = +20 °C: 391.8902821 V     T = -25 °C: 356.937648 V
Voltage for Gain 200: T = +20 °C: 396.2116841 V     T = -25 °C: 361.0203032 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.623784473 V-1     T = -25 °C: 4.615958328 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.177395894 V-1     T = -25 °C: 9.741955811 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31374751 V-1     T = -25 °C: 14.96830325 V-1
Break-through voltage: T = +20 °C: 412.7818229 V     T = -25 °C: 375.7890403 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:06 CEST jreher Updated box and position via API.
14. Apr 2021 18:46:23 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:07:05 CET jreher Updated box and position via API.
11. Aug 2020 18:01:19 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:42 CEST jreher Updated APD location via API.
28. Jan 2020 16:59:05 CET vwerner Updated APD batch assignment via API.
28. Jan 2020 16:50:38 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:48:56 CET jreher Updated APD location via API.
27. Nov 2019 19:54:36 CET jreher Updated APD location via API.
25. Nov 2019 17:22:25 CET jreher Updated box and position via API.
23. Sep 2019 17:21:27 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:11 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:25 CEST Tobias Imported from Hamamatsu datasheet.