RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3304035685 - Archived data from Wed, 16. June 2021 15:52:41 CEST


This is all the information about APD 3304035685. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3304035685
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.5 V
Dark current: 36.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 146
Position in Box: 9
EP1 batch: 169
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8560702 V     T = -25 °C: 350.3510366 V
Voltage for Gain 150: T = +20 °C: 392.6465697 V     T = -25 °C: 357.6340142 V
Voltage for Gain 200: T = +20 °C: 397.0036835 V     T = -25 °C: 361.7337163 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.707759618 V-1     T = -25 °C: 4.831610747 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.24094168 V-1     T = -25 °C: 9.923370277 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.37133836 V-1     T = -25 °C: 15.70631527 V-1
Break-through voltage: T = +20 °C: 411.3229642 V     T = -25 °C: 375.9378703 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:25:45 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:43 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:00 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:07:05 CET jreher Updated box and position via API.
11. Aug 2020 18:01:18 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:42 CEST jreher Updated APD location via API.
28. Jan 2020 16:36:48 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:55 CET jreher Updated APD location via API.
27. Nov 2019 19:54:35 CET jreher Updated APD location via API.
25. Nov 2019 17:22:25 CET jreher Updated box and position via API.
23. Sep 2019 17:21:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:11 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:25 CEST Tobias Imported from Hamamatsu datasheet.