RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3303035654 - Archived data from Tue, 11. August 2020 18:01:16 CEST


This is all the information about APD 3303035654. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3303035654
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 36.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 145
Position in Box: 45
EP1 batch: 169
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.1632015 V     T = -25 °C: 349.7813121 V
Voltage for Gain 150: T = +20 °C: 391.9253613 V     T = -25 °C: 356.9809612 V
Voltage for Gain 200: T = +20 °C: 396.2671937 V     T = -25 °C: 361.0323415 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.614157194 V-1     T = -25 °C: 5.144052508 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.080773613 V-1     T = -25 °C: 9.72397787 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.06986282 V-1     T = -25 °C: 15.42109082 V-1
Break-through voltage: T = +20 °C: 410.7939611 V     T = -25 °C: 375.2608355 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:01 CET jreher Updated box and position via API.
11. Aug 2020 18:01:16 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:41 CEST jreher Updated APD location via API.
28. Jan 2020 16:36:47 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:54 CET jreher Updated APD location via API.
27. Nov 2019 19:54:27 CET jreher Updated APD location via API.
25. Nov 2019 17:22:23 CET jreher Updated box and position via API.
23. Sep 2019 17:21:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:10 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:24 CEST Tobias Imported from Hamamatsu datasheet.