RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3303035644 - Archived data from Tue, 11. August 2020 18:01:14 CEST


This is all the information about APD 3303035644. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3303035644
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 34.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 145
Position in Box: 37
EP1 batch: 169
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8162687 V     T = -25 °C: 349.1953364 V
Voltage for Gain 150: T = +20 °C: 391.5842261 V     T = -25 °C: 356.4298101 V
Voltage for Gain 200: T = +20 °C: 395.9026376 V     T = -25 °C: 360.4907073 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.705052919 V-1     T = -25 °C: 4.949975763 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.42360618 V-1     T = -25 °C: 9.25171303 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.70330157 V-1     T = -25 °C: 16.53343577 V-1
Break-through voltage: T = +20 °C: 410.9792783 V     T = -25 °C: 375.0879673 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:00 CET jreher Updated box and position via API.
11. Aug 2020 18:01:14 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:40 CEST jreher Updated APD location via API.
28. Jan 2020 16:36:46 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:54 CET jreher Updated APD location via API.
27. Nov 2019 19:54:27 CET jreher Updated APD location via API.
25. Nov 2019 17:22:22 CET jreher Updated box and position via API.
23. Sep 2019 17:21:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:10 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:24 CEST Tobias Imported from Hamamatsu datasheet.