RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3302035616 - Archived data from Tue, 11. August 2020 18:01:12 CEST


This is all the information about APD 3302035616. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3302035616
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 27.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 145
Position in Box: 22
EP1 batch: 168
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4112606 V     T = -25 °C: 345.2582851 V
Voltage for Gain 150: T = +20 °C: 387.1580172 V     T = -25 °C: 352.424425 V
Voltage for Gain 200: T = +20 °C: 391.4991482 V     T = -25 °C: 356.4457936 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.541638705 V-1     T = -25 °C: 4.971938874 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.878871977 V-1     T = -25 °C: 9.373318719 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.53576293 V-1     T = -25 °C: 16.92762558 V-1
Break-through voltage: T = +20 °C: 406.0889604 V     T = -25 °C: 370.4009013 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:59 CET jreher Updated box and position via API.
11. Aug 2020 18:01:12 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:38 CEST jreher Updated APD location via API.
28. Jan 2020 16:32:54 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:53 CET jreher Updated APD location via API.
27. Nov 2019 19:54:25 CET jreher Updated APD location via API.
25. Nov 2019 17:22:21 CET jreher Updated box and position via API.
23. Sep 2019 17:21:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:10 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:23 CEST Tobias Imported from Hamamatsu datasheet.