RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0807007700 - Archived data from Tue, 11. August 2020 17:56:45 CEST


This is all the information about APD 0807007700. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0807007700
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.8 V
Dark current: 3.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 297
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 91
Position in grid: 0
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 16. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 385.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.702293 V     T = -25 °C: 349.8667927 V
Voltage for Gain 150: T = +20 °C: 393.5943765 V     T = -25 °C: 357.3217246 V
Voltage for Gain 200: T = +20 °C: 397.9622904 V     T = -25 °C: 361.497735 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.640814028 V-1     T = -25 °C: 4.90437373 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.24226037 V-1     T = -25 °C: 9.031354505 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34706262 V-1     T = -25 °C: 15.85880848 V-1
Break-through voltage: T = +20 °C: 413.1448651 V     T = -25 °C: 376.9073443 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:02:48 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:23 CET jreher Updated box and position via API.
05. Feb 2021 11:26:39 CET jreher Updated box and position via API.
11. Aug 2020 17:56:45 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:13 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:04 CEST jreher Updated box and position via API.
19. Dec 2019 15:48:32 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:30 CET jreher Updated box and position via API.
23. Aug 2017 16:05:03 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:09:14 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:57:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:20 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:35 CEST Tobias Imported from Hamamatsu datasheet.