RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3301035554 - Archived data from Tue, 11. August 2020 17:55:20 CEST


This is all the information about APD 3301035554. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3301035554
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 35.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 144
Position in Box: 36
EP1 batch: 167
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5523515 V     T = -25 °C: 347.8034107 V
Voltage for Gain 150: T = +20 °C: 390.2763954 V     T = -25 °C: 355.0228653 V
Voltage for Gain 200: T = +20 °C: 394.5732413 V     T = -25 °C: 359.0829044 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.502776404 V-1     T = -25 °C: 5.114795082 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.82792272 V-1     T = -25 °C: 9.674649586 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.52135073 V-1     T = -25 °C: 15.33752358 V-1
Break-through voltage: T = +20 °C: 408.8459941 V     T = -25 °C: 373.1388576 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:53 CET jreher Updated box and position via API.
11. Aug 2020 17:55:20 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:35 CEST jreher Updated APD location via API.
12. Dec 2019 14:39:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:50 CET jreher Updated APD location via API.
27. Nov 2019 19:54:15 CET jreher Updated APD location via API.
25. Nov 2019 17:22:17 CET jreher Updated box and position via API.
23. Sep 2019 17:22:07 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:24 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:08 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:22 CEST Tobias Imported from Hamamatsu datasheet.