RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3217035502 - Archived data from Fri, 05. February 2021 11:06:46 CET


This is all the information about APD 3217035502. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3217035502
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 26.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 53
Position in Box: 48
EP1 batch: 166
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.2770429 V     T = -25 °C: 348.6362524 V
Voltage for Gain 150: T = +20 °C: 392.042863 V     T = -25 °C: 356.0245858 V
Voltage for Gain 200: T = +20 °C: 396.3371128 V     T = -25 °C: 360.1736521 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.530156153 V-1     T = -25 °C: 5.029737161 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.933998556 V-1     T = -25 °C: 9.311846136 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.8404114 V-1     T = -25 °C: 14.68964121 V-1
Break-through voltage: T = +20 °C: 409.788718 V     T = -25 °C: 373.66764 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:46:19 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:06:46 CET jreher Updated box and position via API.
11. Aug 2020 18:01:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:32 CEST jreher Updated APD location via API.
28. Jan 2020 16:22:51 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:47 CET jreher Updated APD location via API.
27. Nov 2019 19:54:05 CET jreher Updated APD location via API.
25. Nov 2019 17:22:13 CET jreher Updated box and position via API.
23. Sep 2019 17:22:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:17 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:07 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:25 CEST Tobias Imported from Hamamatsu datasheet.