RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3214035368 - Archived data from Tue, 11. August 2020 17:55:00 CEST


This is all the information about APD 3214035368. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3214035368
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 26.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 141
Position in Box: 34
EP1 batch: 163
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.4744627 V     T = -25 °C: 350.3529716 V
Voltage for Gain 150: T = +20 °C: 392.3140608 V     T = -25 °C: 357.8617976 V
Voltage for Gain 200: T = +20 °C: 396.6681354 V     T = -25 °C: 362.177972 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.4354968 V-1     T = -25 °C: 4.588145671 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.68491044 V-1     T = -25 °C: 9.439511018 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18625932 V-1     T = -25 °C: 13.95845993 V-1
Break-through voltage: T = +20 °C: 411.3101548 V     T = -25 °C: 375.2037227 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:33 CET jreher Updated box and position via API.
11. Aug 2020 17:55:00 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:25 CEST jreher Updated APD location via API.
12. Dec 2019 14:41:08 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:41 CET jreher Updated APD location via API.
27. Nov 2019 19:53:45 CET jreher Updated APD location via API.
25. Nov 2019 17:22:06 CET jreher Updated box and position via API.
20. Sep 2019 18:49:15 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:55:06 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:04 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:24 CEST Tobias Imported from Hamamatsu datasheet.