RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3212035318 - Archived data from Fri, 05. February 2021 11:06:29 CET


This is all the information about APD 3212035318. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3212035318
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 389.3 V
Dark current: 22.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 141
Position in Box: 3
EP1 batch: 162
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.3476416 V     T = -25 °C: 352.4233326 V
Voltage for Gain 150: T = +20 °C: 396.1479939 V     T = -25 °C: 359.8930706 V
Voltage for Gain 200: T = +20 °C: 400.4825281 V     T = -25 °C: 364.0814367 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.519132474 V-1     T = -25 °C: 4.697355002 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.92949933 V-1     T = -25 °C: 9.534098108 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.7812625 V-1     T = -25 °C: 14.9433642 V-1
Break-through voltage: T = +20 °C: 415.2096896 V     T = -25 °C: 378.8373288 V
   
Notes:


Version history

Time Author Change comment
27. Aug 2021 10:30:29 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:06:29 CET jreher Updated box and position via API.
11. Aug 2020 17:54:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:22 CEST jreher Updated APD location via API.
12. Dec 2019 14:41:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:39 CET jreher Updated APD location via API.
27. Nov 2019 19:53:43 CET jreher Updated APD location via API.
25. Nov 2019 17:22:03 CET jreher Updated box and position via API.
20. Sep 2019 18:48:51 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:55:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:03 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:23 CEST Tobias Imported from Hamamatsu datasheet.