RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3212035315 - Archived data from Tue, 11. August 2020 17:54:54 CEST


This is all the information about APD 3212035315. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3212035315
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.4 V
Dark current: 17.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 140
Position in Box: 50
EP1 batch: 162
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.8912674 V     T = -25 °C: 350.8389348 V
Voltage for Gain 150: T = +20 °C: 394.646902 V     T = -25 °C: 358.2602387 V
Voltage for Gain 200: T = +20 °C: 398.9251642 V     T = -25 °C: 362.4215684 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.704094229 V-1     T = -25 °C: 4.961357213 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.499795104 V-1     T = -25 °C: 9.235687771 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.09274721 V-1     T = -25 °C: 14.55543996 V-1
Break-through voltage: T = +20 °C: 413.3610105 V     T = -25 °C: 376.9389949 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:27 CET jreher Updated box and position via API.
11. Aug 2020 17:54:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:22 CEST jreher Updated APD location via API.
12. Dec 2019 14:41:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:39 CET jreher Updated APD location via API.
27. Nov 2019 19:53:36 CET jreher Updated APD location via API.
25. Nov 2019 17:22:02 CET jreher Updated box and position via API.
20. Sep 2019 18:48:51 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:03 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:23 CEST Tobias Imported from Hamamatsu datasheet.