Serial: 3212035297
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.6 V
Dark current: 25.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 140
Position in Box: 36
EP1 batch: 162
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3818579 V     T = -25 °C: 348.404267 V
Voltage for Gain 150: T = +20 °C: 392.2561383 V     T = -25 °C: 355.8404006 V
Voltage for Gain 200: T = +20 °C: 396.6275469 V     T = -25 °C: 360.0171291 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.446987801 V-1     T = -25 °C: 4.753499831 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.715092861 V-1     T = -25 °C: 9.505770844 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07670127 V-1     T = -25 °C: 15.00014477 V-1
Break-through voltage: T = +20 °C: 412.4369852 V     T = -25 °C: 375.6744682 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:25 CET jreher Updated box and position via API.
11. Aug 2020 17:54:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:20 CEST jreher Updated APD location via API.
12. Dec 2019 14:42:35 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:38 CET jreher Updated APD location via API.
27. Nov 2019 19:53:34 CET jreher Updated APD location via API.
25. Nov 2019 17:22:01 CET jreher Updated box and position via API.
20. Sep 2019 18:48:50 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:03 CET Tobias Corrected dark current unit.