RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3212035290 - Archived data from Fri, 05. February 2021 11:06:24 CET


This is all the information about APD 3212035290. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3212035290
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 20.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 140
Position in Box: 29
EP1 batch: 162
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.622645 V     T = -25 °C: 349.7528458 V
Voltage for Gain 150: T = +20 °C: 393.4723442 V     T = -25 °C: 357.1862359 V
Voltage for Gain 200: T = +20 °C: 397.8206466 V     T = -25 °C: 361.3632354 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.385081448 V-1     T = -25 °C: 4.982679006 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.544998571 V-1     T = -25 °C: 9.170333144 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.81062298 V-1     T = -25 °C: 14.41854641 V-1
Break-through voltage: T = +20 °C: 413.0825464 V     T = -25 °C: 376.477009 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 18:52:04 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:40 CET jreher Updated box and position via API.
05. Feb 2021 11:06:24 CET jreher Updated box and position via API.
11. Aug 2020 17:54:49 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:20 CEST jreher Updated APD location via API.
12. Dec 2019 14:42:34 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:37 CET jreher Updated APD location via API.
27. Nov 2019 19:53:34 CET jreher Updated APD location via API.
25. Nov 2019 17:22:01 CET jreher Updated box and position via API.
20. Sep 2019 18:48:49 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:02 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:23 CEST Tobias Imported from Hamamatsu datasheet.