RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3211035244 - Archived data from Tue, 11. August 2020 17:54:44 CEST


This is all the information about APD 3211035244. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3211035244
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 389.2 V
Dark current: 23 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 140
Position in Box: 4
EP1 batch: 161
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.8617635 V     T = -25 °C: 352.1270239 V
Voltage for Gain 150: T = +20 °C: 395.6756732 V     T = -25 °C: 359.6061344 V
Voltage for Gain 200: T = +20 °C: 399.9958998 V     T = -25 °C: 363.7882304 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.637070869 V-1     T = -25 °C: 4.794085462 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.28158171 V-1     T = -25 °C: 9.662687929 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52340371 V-1     T = -25 °C: 15.32919032 V-1
Break-through voltage: T = +20 °C: 413.7085115 V     T = -25 °C: 377.6988294 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:21 CET jreher Updated box and position via API.
11. Aug 2020 17:54:44 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:17 CEST jreher Updated APD location via API.
12. Dec 2019 14:43:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:35 CET jreher Updated APD location via API.
27. Nov 2019 19:53:32 CET jreher Updated APD location via API.
25. Nov 2019 17:21:58 CET jreher Updated box and position via API.
20. Sep 2019 18:48:18 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:01 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:22 CEST Tobias Imported from Hamamatsu datasheet.