RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3211035234 - Archived data from Tue, 11. August 2020 17:54:42 CEST


This is all the information about APD 3211035234. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3211035234
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 382.6 V
Dark current: 23.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 139
Position in Box: 47
EP1 batch: 160
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8570773 V     T = -25 °C: 347.3521197 V
Voltage for Gain 150: T = +20 °C: 390.7140481 V     T = -25 °C: 354.6968572 V
Voltage for Gain 200: T = +20 °C: 395.0676682 V     T = -25 °C: 358.8083465 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.669725855 V-1     T = -25 °C: 4.830236956 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.281947008 V-1     T = -25 °C: 9.908110781 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.51806977 V-1     T = -25 °C: 15.81504788 V-1
Break-through voltage: T = +20 °C: 410.7604316 V     T = -25 °C: 374.0907514 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:52:18 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:50 CET jreher Updated box and position via API.
05. Feb 2021 11:06:18 CET jreher Updated box and position via API.
11. Aug 2020 17:54:42 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:17 CEST jreher Updated APD location via API.
12. Dec 2019 14:43:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:35 CET jreher Updated APD location via API.
27. Nov 2019 19:53:24 CET jreher Updated APD location via API.
25. Nov 2019 17:21:57 CET jreher Updated box and position via API.
20. Sep 2019 18:47:07 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:01 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:22 CEST Tobias Imported from Hamamatsu datasheet.